Inergy Midstream
Stagecoach
Location: 150 miles northwest
of New York City and atop the Marcellus Shale play
Facility Overview
- Working gas = 26.25
Bcf
- High performance, multi-cycle gas storage with 250/500 MMcf/day injection/withdrawal
capability
- Connected to TGP’s 300 Line and Millennium Pipeline
- Wheeling opportunities
between TGP and Millennium
- Proposed Marc I Hub Line would provide additional
pipeline connections
- 100% contracted with long-term contracts
Website: www.stagecoachstorage.com
