Inergy Midstream
Marc I Pipeline Project
Location: Bradford County, PA and Sullivan County, PA,
and located atop the Marcellus Shale
Facility Overview
- The 39 mile, 30 inch bi-directional gas pipeline connecting Inergy’s
Stagecoach South Lateral pipeline interconnect at TGP’s 300 line to Transco’s
Leidy Line
- Together
with Inergy’s North-South Pipeline, this pipeline allows shippers to wheel/transport
gas bi-directionally on a firm basis approximately 75 miles between the
Millennium Pipeline and Transco’s Leidy Line and all points in between
- Owned by Inergy Midstream, L.P.

